UN R94 Base text (04 series) · UNECE Regulation No. 94 (ECE R94) — Uniform provisions concerning the approval of vehicles with regard to the protection of the occupants, fuel system integrity and protection against electrical shock in the event of a frontal collision.
UN R94 — 04 series of amendments
Changes from 03 series of amendments (supplement 2)
- What changed
- In the “Low electrical energy” criterion, the Total Energy (TE) on the high voltage buses must now be less than 0.2 joules, not 2.0 joules.
- New paragraph 5.2.8.4. says that, from the impact until 60 minutes after it, there must be no evidence of fire or explosion from the REESS.
- As from 1 September 2023, Contracting Parties applying this Regulation are not obliged to accept preceding-series type-approvals of vehicles first issued after 1 September 2023.
- Why
- The technical provisions of UN GTR No. 20 are adopted for UN Regulation No. 94 with respect to the post-crash electrical safety.
- Administrative provisions are adapted for the revision 3 of the 1958 Agreement.
- At GRSP, the expert from OICA introduced GRSP-67-27 to amend transitional provisions, and the expert from Japan introduced GRSP-67-20-Rev.1 amending the definition of REESS.
Q1What changed245 changes
Protection against electrical shock after the impact (paras. 5.2.8. to 5.2.8.1.4.2.)
After the impact, the high voltage buses must meet at least one of the four criteria in paragraphs 5.2.8.1.1. to 5.2.8.1.4.2. In the “Low electrical energy” criterion, the Total Energy (TE) on the high voltage buses must now be less than 0.2 joules, not 2.0 joules. The energy stored in the Y-capacitors (TEy1, TEy2) must also be less than 0.2 joules, not 2.0 joules. In the “Absence of high voltage” criterion, the voltage limits for Ub, U1 and U2 now apply within 60 s after the impact. A new resistance limit also applies between any two simultaneously reachable exposed conductive parts of electrical protection barriers/enclosures less than 2.5 m apart. If conductively connected, the AC and DC high voltage buses must meet one of three isolation resistance options, (a) to (c), in paragraph 5.2.8.1.4.2.
Electrolyte leakage, REESS retention and REESS fire hazards (paras. 5.2.8.2. to 5.2.8.4.)
Paragraph 5.2.8.2. is now titled “Electrolyte leakage” instead of “Electrolyte spillage”, with separate rules for aqueous and non-aqueous electrolyte REESS. For aqueous electrolyte REESS, there must be no electrolyte leakage into the passenger compartment until 60 minutes after the impact, not 30 minutes. For aqueous electrolyte REESS, at most 7 per cent by volume of the electrolyte, up to 5.0 l, may leak outside the passenger compartment. For non-aqueous electrolyte REESS, no liquid electrolyte may leak into the passenger compartment, luggage compartment or outside the vehicle until 60 minutes after the impact. The REESS must now remain attached to the vehicle by at least one component anchorage, bracket, or any load-transferring structure. New paragraph 5.2.8.4. says that, from the impact until 60 minutes after it, there must be no evidence of fire or explosion from the REESS.
REESS, high voltage bus and other electrical safety definitions (paras. 2.14. to 2.43.)
The term “electrical power train” is replaced with “electric power train” throughout the document, for example in paragraphs 2.16. and 3.2.6. Paragraph 2.14. now excludes a battery whose primary use is to supply power for starting the engine and/or lighting and/or other vehicle auxiliaries’ systems. Under paragraph 2.29., where galvanically connected electric circuits fulfil the specific voltage condition, only their high voltage components or parts are high voltage bus. In the “Live parts” definition, “in normal use” is now “under normal operating conditions”, which new paragraph 2.39. defines. New paragraphs 2.36. to 2.43. define aqueous and non-aqueous electrolyte, electrolyte leakage, normal operating conditions, specific voltage condition, State of Charge (SOC), fire and explosion. In the “Exposed conductive part” definition, “becomes electrically energized” is now “is not normally energized, but which can become electrically energized”.
Procedures for SOC adjustment (Annex 3, paras. 1.4.4.1. to 1.4.4.1.3.)
Annex 3, paragraph 1.4.4.1. now gives “Procedures for SOC adjustment”. The adjustment of SOC must be conducted at an ambient temperature of 20 ± 10 °C. A REESS designed to be externally charged must be charged to the highest SOC by the manufacturer's normal-operation procedure, until charging normally terminates. A REESS designed to be charged only by an energy source on the vehicle must reach the highest SOC achievable with normal vehicle operation. For a REESS designed to be externally charged, SOC at the test must be no less than 95 per cent of the adjusted SOC. For a REESS designed to be charged only by an energy source on the vehicle, the minimum is 90 per cent.
Test procedures for the vehicles equipped with electric power trains (Annex 11)
Throughout Annex 11, the voltage symbols V, Vb, V1, V1’, V2 and V2’ are replaced with U, Ub, U1, U1’, U2 and U2’. In paragraphs 2. and 3., voltages are now measured between 10 and 60 seconds after the impact, instead of between 5 and 60 seconds. In formulas (b) and (c) of paragraph 3., the “– 3 600” term is deleted. The jointed test finger is now described in Figure 3, and the Annex 11 Appendix is deleted. Paragraph 4.1. now gives two test methods for measuring electric resistance: a resistance tester, or a DC power supply, voltmeter and ammeter. Paragraph 5.2. now gives two isolation resistance methods: DC voltage from external sources, or the vehicle's own REESS as DC voltage source.
Approval number, modification of the vehicle type and approval forms (paras. 4.2. to 10.)
An approval number is now assigned to each type approved in accordance with Schedule 4 of the Agreement (E/ECE/TRANS/505/Rev.3) (para. 4.2.). The approval mark examples in Annex 2 now show approval number 041424 and the 04 series of amendments. Every modification of the vehicle type with regard to this Regulation must be notified to the Type Approval Authority which approved that vehicle type. The Authority may then decide, in consultation with the manufacturer, to grant a new type approval, or apply the “Revision” and, if applicable, “Extension” procedures. Old paragraphs 7.1.2.1. to 7.1.2.2.2. on repeated, simplified and partial tests, paragraph 7.3. and paragraph 8.2. are deleted. Withdrawal and discontinued production notices now use a copy of the approval form with the signed and dated annotation “APPROVAL WITHDRAWN” or “PRODUCTION DISCONTINUED”.
Transitional provisions for the 04 series of amendments (paras. 12. to 12.5.)
Paragraph 11. is deleted, the former paragraph 12. is renumbered as 11., and new paragraphs 12. to 12.5. give the transitional provisions. As from 1 September 2023, Contracting Parties applying this Regulation are not obliged to accept preceding-series type-approvals of vehicles first issued after 1 September 2023. Contracting Parties applying this Regulation must continue to accept preceding-series type-approvals first issued before 1 September 2023, if those series' transitional provisions foresee this. Paragraph 12.4. now says that Contracting Parties applying this Regulation must not refuse to grant type-approvals according to any preceding series, or extensions thereof. Under paragraph 12.5., Contracting Parties who start to apply this Regulation after the most recent series enters into force need not accept preceding-series type-approvals. Old paragraphs 11.2. to 11.12., 11.14. and 11.15. are deleted.
Q2Why it changed
- Proposed by
- Experts from Japan and the European Commission on behalf of the Task Force
- Working party
- GRSP, 67th session (July 2020)
Reasons
The technical provisions of UN GTR No. 20 are adopted for UN Regulation No. 94 with respect to the post-crash electrical safety. The GRSP report says that the proposal aimed to transpose GTR No. 20, Phase 1 into the framework of the 1958 Agreement.
Sources (2)
“The technical provisions of UN Global Technical Regulation No.20 (UN GTR No. 20) are adopted for UN Regulation No. 94 with respect to the post-crash electrical safety.”
“which aimed to transpose GTR No. 20, Phase 1 into the framework of the 1958 Agreement”
Administrative provisions are adapted for the revision 3 of the 1958 Agreement.
Source
“Administrative provisions are adapted for the revision 3 of the 1958 Agreement.”
At GRSP, the expert from Japan introduced GRSP-67-20-Rev.1 amending the definition of REESS, and the expert from OICA introduced GRSP-67-27 to amend transitional provisions. GRSP adopted the proposal as amended by Annex VI to its report.
Sources (3)
“The expert from Japan introduced GRSP-67-20-Rev.1 amending the definition of REESS.”
“the expert from OICA introduced GRSP-67-27 to amend transitional provisions”
“GRSP adopted ECE/TRANS/WP.29/GRSP/2020/4, as amended by Annex VI to the report.”
Document trail
- 2020-02ProposalECE/TRANS/WP.29/GRSP/2020/4Proposal for the 04 series by the experts from Japan and the European Commission on behalf of the Task Force
- —Working party adoptsECE/TRANS/WP.29/GRSP/67Session report, para. 17: GRSP adopted the proposal as amended by Annex VI
- 2020-08Sent to WP.29ECE/TRANS/WP.29/2020/107Text that GRSP sent to WP.29 and AC.1
- 2020-11WP.29 adoptsECE/TRANS/WP.29/1155Adopted at the 182nd session (session report, para. 133)
- 2021-06-09In forceC.N.191.2021.TREATIES-XI.B.16.94UN depositary notification
Q3Who is affected
Vehicle manufacturer
- If using the “Low electrical energy” criterion, keep TE on the high voltage buses and Y-capacitor energy below 0.2 joules.
- Make sure there is no evidence of fire or explosion from the REESS until 60 minutes after the impact.
- Make sure the REESS remains attached to the vehicle by at least one component anchorage, bracket or load-transferring structure.
- Check electrolyte leakage against the separate aqueous and non-aqueous REESS rules in paragraph 5.2.8.2.
- Provide the method to confirm SOC when the vehicle is tested (Annex 3, para. 1.4.4.1.3.).
- For REESS charged only by an on-vehicle energy source, advise on the vehicle operation mode to attain the highest SOC.
- Be ready for the 1 September 2023 date in paragraph 12.2.
Component supplier
- Check REESS designs against the amended leakage and retention rules and the new fire hazard rule (paras. 5.2.8.2. to 5.2.8.4.).
- Check the resistance of exposed conductive parts of electrical protection barriers/enclosures against the amended limits.
Technical service / Approval authority
- When measuring voltages under Annex 11, paragraphs 2. and 3., do so between 10 and 60 seconds after the impact.
- If in doubt, or if the connection is not welded, use an Annex 11, paragraph 4.1. resistance test procedure.
- Select the Annex 11, paragraph 5.2.1. or 5.2.2. isolation resistance method, depending on the live parts' charge or isolation resistance.
- Check that test SOC meets the 95 or 90 per cent minimums of Annex 3, paragraph 1.4.4.1.3.
- Check for evidence of fire or explosion from the REESS until 60 minutes after the impact.
See every change side by side
RegVault customers compare every version of UN regulations, read the consolidated text and download the PDF.
ⓘ This report gives advice only. It is not legal or type-approval advice.