UN R49 Supplement 10 (06 series) · UNECE Regulation No. 49 (ECE R49) — Uniform provisions concerning the measures to be taken against the emission of gaseous and particulate pollutants from compression-ignition engines and positive ignition engines for use in vehicles.
UN R49 — Supplement 10 to the 06 series of amendments
Supplement 9 → 10
- What changed
- PM number is no longer a pollutant to measure with PEMS (Annex 8, Appendix 1, paragraph A.1.1.).
- Table 1 “Test parameters” no longer has the two rows with the PM number analyser as source (paragraph A.1.2.2.).
- This supplement deletes paragraphs 10.1.9.24a. and 10.1.11.9bis. of Annex 8 on the CO2 mass window PM number conformity factor.
- Why
- Supplement 9 added some paragraphs by mistake to a part that does not exist in the 06 series.
- OICA proposed to delete the PEMS PM number, which the 06 series does not require.
Q1What changed5 changes
PM number removed from the PEMS pollutant list (para. A.1.1.)
With PEMS, the pollutants to measure for compression ignition engines include carbon monoxide, total hydrocarbons and nitrogen oxides. For positive ignition engines, they include carbon monoxide, non-methane hydrocarbons, methane and nitrogen oxides. Before this supplement, both lists also included PM number. If all the fuels used have a molar carbon to hydrogen ratio of 0, the manufacturer may choose to measure only THC, CO and NOx. Before this supplement, this choice also included PM number.
PM number rows deleted from Table 1 (para. A.1.2.2.)
Table 1 “Test parameters” no longer has the row for PM number concentration (#/cm3). It also no longer has the row “Dilution setting (if applicable)”. The PM number analyser was the source for both rows.
CO2 mass window PM number conformity factor deleted (Annex 8, paras. 10.1.9.24a. and 10.1.11.9bis.)
Annex 8 no longer has paragraphs 10.1.9.24a. and 10.1.11.9bis. Both paragraphs listed the CO2 mass window PM number conformity factor. They applied to engines where none of the fuels used has a molar carbon to hydrogen ratio of 0. Annex 8 covers the conformity of in-service engines or vehicles.
Q2Why it changed
- Proposed by
- Expert from France, with an addition from OICA
- Working party
- GRPE, 91st session (October 2024)
Reasons
Supplement 9 added some paragraphs by mistake to a part that does not exist in the 06 series. The proposal from France deletes these paragraphs, among them paragraphs 10.1.9.24a. and 10.1.11.9bis. of Annex 8.
Source
“Delete paragraphs that were mistakenly introduced in Supplement 9 to the 06 series of amendments to UN Regulation No. 49 to non-existing part of the 06 series of amendments to UN Regulation No. 49.”
In addition to the French proposal, OICA proposed to delete the PEMS PM number. An earlier amendment had added it, but the 06 series does not require it.
Source
“In addition to the French proposal, OICA proposes to delete the PEMS PM number as it had been added in previous amendment, which is not required by 06 series of Amendments to UN Regulation No. 49.”
Document trail
- 2024-07ProposalECE/TRANS/WP.29/GRPE/2024/21Proposal by the expert from France
- —Amended in sessionGRPE-91-37Changes proposed by OICA
- —Working party adoptsECE/TRANS/WP.29/GRPE/91Session report, para. 32 and Annex V
- 2024-12Sent to WP.29ECE/TRANS/WP.29/2025/26Text that GRPE sent to WP.29 and AC.1
- 2025-03WP.29 adoptsECE/TRANS/WP.29/1184Adopted at the 195th session (session report, para. 109)
- 2025-09-26In forceC.N.514.2025.TREATIES-XI.B.16.49UN depositary notification
Q3Who is affected
Vehicle manufacturer
- Check that your PEMS test plans use the new pollutant list, which no longer includes PM number.
- Check that your test set-up and data files match the new list of test parameters, without the PM number rows.
- Update the documents that refer to paragraphs 10.1.9.24a. or 10.1.11.9bis. of Annex 8, which no longer exist.
Component supplier
- If you supply PEMS equipment, check your set-up documents: PM number is no longer a pollutant to measure.
Technical service / Approval authority
- Be ready for PEMS test results that do not include PM number.
- Be ready for in-service conformity results under Annex 8 without the CO2 mass window PM number conformity factor.
See every change side by side
RegVault customers compare every version of UN regulations, read the consolidated text and download the PDF.
ⓘ This report gives advice only. It is not legal or type-approval advice.
More UN R49 change reports
- 07 series — Supplement 5
- 07 series — Supplement 4
- 07 series — Supplement 3, Corrigendum 1
- 07 series — Supplement 3
- 07 series — Supplement 2
- 07 series — Supplement 1
- 07 series — Base text
- 06 series — Supplement 11
- 06 series — Supplement 9
- 06 series — Supplement 7
- 06 series — Supplement 6
- 05 series — Supplement 12
- 05 series — Supplement 11
- 05 series — Supplement 10